Ex Officine Battistini | Pier Currà Architettura

student housing in Cesena cesena / Italy / 2024

3
3 Love 304 Visits Published

Located in Cesena, near the historic center and the railway station, the project involves the restoration and redevelopment of the former Officine Battistini – a workshop building dating back to the 1940s – by creating university residences and services dedicated to students, such as study rooms, refreshment areas, and commercial spaces. The proposed intervention includes not only the reorganization of the existing building by incorporating common areas and residences but also its transformation through a new tower structure on the west side, designed to accommodate the majority of the housing units.
A key architectural gesture is the creation of two large green courtyards within the building’s volume, aimed at improving the psychological and physical well-being of the occupants by providing natural ventilation and light, and offering a green view even for the innermost rooms. Accessibility and public utility are further enhanced through the integration of co-working spaces and a large dining area on the ground floor, making the building a vibrant meeting point for both residents and the community.
At the heart of the project is the concept of ecological transition, which aims to align architectural practices with sustainable development goals to reduce the environmental impact of buildings while promoting urban sustainability.

3 users love this project
Comments
    comment
    user
    Enlarge image

    Located in Cesena, near the historic center and the railway station, the project involves the restoration and redevelopment of the former Officine Battistini – a workshop building dating back to the 1940s – by creating university residences and services dedicated to students, such as study rooms, refreshment areas, and commercial spaces. The proposed intervention includes not only the reorganization of the existing building by incorporating common areas and residences but also its...

    Project details
    • Year 2024
    • Work started in 2022
    • Status Current works
    • Type Masterplan / Apartments / Tower blocks/Skyscrapers / Urban area recovery, squares and streets / Recovery of industrial buildings
    Archilovers On Instagram
    Lovers 3 users