Nujiang River 72 | Archermit
China / 2024
Every child who dreams of Tibet holds a G318 dream. The Sichuan-Tibet Highway, renowned as "China's Scenic Avenue," has always been a sacred route for travelers. About 200 km past the junction of the southern and northern Sichuan-Tibet routes from Chengdu to Lhasa lies the most spectacular part of the journey. In the small town of Baxoi, meaning “village under the warrior’s mountain” in Tibetan, famous sights like the Bangda Grassland, Nujiang Grand Canyon, Ranwu Lake, and Laigu Glacier, all connected like sparkling pearls along G318. For those chasing their dreams on G318, the most anticipated thrill and challenge awaits in the “Devil’s Section” of the Sichuan-Tibet Highway within Baxoi—72 Turns of Nujiang River.
The saying 'eyes in heaven, body in hell' reflects the personal experience of many visitors to Tibet. Despite this, Tibet remains a spiritual destination for countless people. Whether it's the cultural beliefs or the landscapes and local customs, the 'experience' is the key motive for all types of travelers to Tibet. Whether through prostration pilgrimage, trekking, cycling, or self-driving, self-challenge is the core belief and pursuit for many Tibet enthusiasts. In 2017, we introduced the famous eastern gem of Tibet, Ranwu Lake, through the Ranwu Lake International Self-Driving and RV Camping Project. Now, seven years later, we are excited to share the journey through the Devil's Road, the 72 Turns of Nujiang. In March 2019, a bold and daring dream began to take shape on the cliffs by the river at the foot of the 72 Turns. After six years of tough challenges, in September 2024, the Nujiang River 72 Turns Canyon Scenic Area has been completed. Its arrival will offer G318 travelers a new playground to pursue thrills and challenges.
The Nujiang River 72 Turns Canyon Scenic Area is located in Buze Village, Baxu County, Changdu City, Tibet, approximately 48.5 kilometers from Baxoi County and about 97 kilometers from Bangda Airport in Changdu. The scenic area is situated in the Nujiang Grand Canyon along the G318 Sichuan-Tibet South Line, in the region known for the most dangerous section of the G318, the famous 'Heavenly Road 72 Turns' and the Nujiang Grand Canyon. The design, construction, and future visitor experiences of the Nujiang River 72 Turns Canyon Scenic Area all embody a spirit of great challenge and pay tribute to the monumental achievements of the Sichuan-Tibet Highway. All design inspiration comes from this magical scenic avenue.
The high-altitude glass viewing platform serves as the core structure of the project, inspired by the iconic 'hairpin turn' road layout of the Nujiang River 72 Turns. Perched on the cliffs of the Nujiang Canyon, with a drop of over 130 meters, the steel truss structure extends outward with a single cantilever of 37 meters, forming the 'hairpin turn.' The ground is laid with high-transparency safety glass, creating a true 'heavenly road' in the air, transforming the thrilling driving experience of the Nujiang River 72 Turns into an ultimate high-altitude walking experience. This allows visitors to deeply experience the majestic wild beauty and breathtaking allure of the Nujiang Canyon. The exterior materials primarily consist of weather-resistant steel plates in a Tibetan red color, responding to the cultural significance of the region’s colors while also standing out from the surrounding environment. The highly weather-resistant steel is not only sturdy and durable, but its rough texture also engages in a dialogue and fusion with the rugged landscapes around it.
The zip line and Thrilling Steps challenge bridge that span the Nujiang River are not new concepts in similar amusement projects across the country, but their presence here is necessary. Looking back at the construction process of the Sichuan-Tibet Highway, one can find numerous scenes of similar amusement facilities under construction; it is precisely these extremely dangerous construction methods that have contributed to the miracle of the Sichuan-Tibet Highway. Seventy years ago, when road and bridge construction technology was still immature, the wisdom and courage of the builders were truly admirable. Although we now possess very advanced construction technologies and methods, the geographical and transportation constraints of the Nujiang Canyon mean that the construction of the Nujiang River 72 Turns Canyon Scenic Area still relies on many 'traditional methods' from decades ago. Through the experiences of the zip line and the Thrilling Steps challenge bridge, we can gain a deeper appreciation of the difficulties faced in building the Sichuan-Tibet Highway, which is the true significance and value of their existence.
Heading towards Baxoi from the scenic area, less than two kilometers away lies the famous Nujiang Bridge. The original Nujiang Bridge was a steel structure with a deck made of steel plates sturdy enough to support vehicle passage. Heavily guarded at the time, vehicles had to stop for inspection and queue up for single-file crossing. The experience of driving across the shaky bridge was nerve-wracking. Today, a new Nujiang Bridge has been completed, while the old Nujiang Bridge has become a revered piece of history, with its vivid stories and scenes still widely recounted and remembered. The design of the glass suspension bridge that spans the river was inspired by that shaky steel Nujiang Bridge. The glass suspension bridge adopts the form of a cable bridge, which naturally brings a swaying sensation. The fierce winds of the Nujiang River further intensify the instability, and the high-transparency glass deck adds to the adrenaline rush for visitors. At the same time, the glass suspension bridge serves as an important link between both sides of the Nujiang River, greatly facilitating future activities such as hiking and outdoor adventures in the scenic area. As visitors walk along the glass bridge, suspended 50 meters above the Nujiang River, they feel the wind, hear the rushing water, the roaring river, and witness the crashing waves—all so close. These sensations will linger long in the minds of the visitors, creating ripples in their memories for years to come.
The sightseeing elevator on the southern bank of the Nujiang River was designed because the steep terrain makes it difficult for tourists to walk. From a convenience standpoint, elevators could have been installed on both banks. On the north bank, for example, after crossing the glass suspension bridge, visitors could take an elevator to easily reach the Leaf Viewing Platform, ascend a short slope to the Space Capsule Viewing Platform, and then climb another short slope to finish, making the entire experience much more relaxed and comfortable. However, we chose to forgo this comfort and did not install an elevator on the north bank. Instead, we built the "Sky Fury 666 Ladder." When visitors, breathless and letting out a string of curses, finally complete this challenging climb and look back at the road they’ve traveled, they will come to truly understand the hardships faced by the builders of the Sichuan-Tibet Highway and the Nujiang River 72 Turns Canyon Scenic Area. Only then can they fully appreciate the meaning of “measuring the treacherous Nujiang with one’s own body.” While the final stretch of the journey is difficult, it is still just a brief, voluntary physical exhaustion, unburdened by heavy loads. But achieving these monumental engineering feats was the work of brave souls, some of whom even gave their lives. How many successes in life are easily attained? Often, the moment closest to success is the hardest. This final stretch, beyond inspiring awe, may also allow visitors to gain an embodied understanding through their physical experience.
The design of the Nujiang River 72 Turns Canyon Scenic Area aims to elevate the experience of confronting the peril of the Nujiang River to the extreme, embodying the concept of “seeking danger within danger and challenging oneself,” thus creating a new geographical landmark for Tibet. It allows travelers on the G318 to break free from the confines of their vehicles and measure the peril of the Nujiang River with their own bodies. This area will provide visitors with a space to challenge their physical, psychological, and mental limits, crafting an unforgettable travel experience that is measured by their own endurance
Dreams grown on cliffs - the challenge of high-altitude engineering practice over six years
Tibet experiences over five months of snow and ice weather each year in most areas. The sudden rain, snow, high temperatures, and strong winds in summer create a very limited time frame and cycle for normal construction activities throughout the year. Additionally, Tibet's complex terrain features rugged roads with many sharp turns and a high density of tunnels and culverts, making these challenges particularly prominent in sections like the Nujiang 72 Turns and the “Tiger Mouth” in the Nujiang Grand Canyon. Instances of landslides and mudflows causing road damage also occur frequently, significantly impacting the transportation of construction materials and equipment. Materials longer than 13 meters are nearly impossible to deliver to the construction site, and large construction equipment such as cranes and pile drivers cannot be transported. Road damage and harsh weather also contribute to uncontrollable transportation times. The high altitude presents a significant physical challenge for construction workers; for example, the Nujiang Viewing Platform is located at an altitude of around 2,800 meters, leading to six different waves of workers just for the pile foundation drilling work. Many workers from lower altitude areas simply cannot adapt to the high-altitude climate, which further limits the pool of available labor. High altitude also poses significant challenges for certain construction processes, such as electric welding, concrete pouring, and metal sheet installation. The temperature difference between day and night in Tibet is extreme, so careful selection of building materials is essential. It’s important to avoid using materials with a high deformation coefficient, as these can age, deform, or detach more easily due to temperature fluctuations. Suitable materials include stone, wood, cement products, locally sourced materials, and some metals with low deformation coefficients. Additionally, it is advisable to use adhesive construction techniques as much as possible and minimize the use of cement bonding methods. On one hand, the short construction cycle in cold regions is not conducive to cement bonding work, while significant temperature differences and winter freezing can lead to cracking, spalling, detachment, and alkali corrosion in cement joints.
The construction process of the Nujiang River 72 Turns Canyon Scenic Area faced a series of challenges that are highly representative of construction projects in Tibet, encompassing nearly all the issues encountered in the region’s architectural endeavors. From the very beginning of the project design, we established the concept of “challenge.” Beyond providing visitors with a unique “challenging” experience, the design and construction of the project itself represent a significant “challenge” in high-altitude engineering. This has great significance for our architectural practices in Tibet.
The north bank of the Nujiang River 72 Turns Canyon Scenic Area is adjacent to the G318 highway, with well-developed road facilities, while the south bank only has rough paths for hand-climbing, making accessibility very poor. Additionally, the project is situated at a high altitude with low oxygen levels and is located right in the valley wind corridor, often experiencing winds of level six or higher. The geological structure of the mountain slopes on both banks is unstable, and rockfalls are common during the rainy season, posing significant safety hazards for construction. From the very beginning, starting with terrain mapping and geological surveys, the design work faced numerous challenges. To create the ultimate “extreme challenge” experience of the Sky Road 72 Turns and the Nujiang Grand Canyon, the design plans involved very bold attempts. Subsequently, extensive specialized design verification was conducted, including disaster assessments, wind tunnel tests, TMD calculations, and cantilever steel structure construction simulations, all providing sufficient technical support for the later construction phase. During the project’s construction, we collaborated with multiple authoritative institutions, industry experts, and professors, along with our construction team, to overcome numerous obstacles. After six years of hard work, the project was successfully brought to fruition. Here, I would like to highlight a few impressive moments that pay tribute to the wisdom and courage of our workers!
The scenic area’s buildings and structures are distributed across both banks of the Nujiang River, which spans over 260 meters. The south bank features rugged paths that require both hands and feet to navigate. Although detailed terrain mapping was conducted in advance, the actual measurement and alignment faced numerous difficulties. Some points were located on steep cliffs, and the strong winds in the valley made it impossible to control drones accurately; thus, we had to rely on RTK surveying equipment for manual alignment. Due to the lack of construction access roads, workers had to secure themselves with safety ropes and dangle over the cliffs to carry out measurements and alignment, a sight that was both alarming and concerning. But this was just the beginning of the story, merely a small overture.
The unique geographical location between the Sky Road 72 Turns and the “Tiger Mouth” of the Nujiang Grand Canyon made it impossible to transport large machinery to the site. During the construction of the pile foundations for the high-altitude glass viewing platform, 39 piles were distributed across different geological layers on the steep cliffs. Due to the lack of roads and a level working surface, we had to resort to manual water-cooled drilling methods for the pile foundation work. The substrate was entirely rocky, with constantly changing rock layers, and most of these layers were extremely hard. We tried over 50 different types of drill bits available in the domestic market, but none were able to reach the required drilling depth. The project team sent rock samples to tool manufacturers in Chongqing, Shandong, and elsewhere for analysis, which eventually led to the development of customized drill bits for the project. The deepest of the 39 piles reached 25 meters. Because of the depth, the later stages of drilling could only be conducted using a layered approach, drilling down 0.6 meters at a time. Workers used a 110 mm diameter water-cooled drill to create a circle of holes around the perimeter and then, secured by safety ropes, descended to the bottom of the 1.8-meter diameter hole to manually break up the remaining rock in the center, which was then hoisted out using a basket. This process involved drilling and extracting layer by layer, progressing downwards in increments of 0.6 meters. After changing six construction teams and with the effort of hundreds of workers over six months, the 39 pile foundations were finally completed.
The transportation of construction personnel and materials to the site was also a significant challenge. In the early stages of the project, due to the lack of access roads on the southern bank of the Nujiang River, construction workers had to drive several kilometers around to cross the river via a temporary bridge and then walk to the construction site. At an altitude of over 2,800 meters, it took workers nearly two hours to reach the site from the construction barracks, consuming about four hours for a round trip (without carrying any loads). The various building foundations on the south bank consisted of reinforced concrete deep piles, while the main structure utilized steel, concrete, steel components, weather-resistant steel plates, stainless steel, and special glass. Although the materials designated for the southern bank had undergone multiple design breakdowns, they were still quite heavy and could not be transported solely by manpower. Additionally, some small to medium-sized construction machinery (such as excavators, crushers, and air compressors) could not reach the south bank. To address these challenges, the project team implemented a temporary cableway similar to the one used decades ago during the construction of the Sichuan-Tibet Highway, allowing for the transportation of construction machinery and personnel between the two banks. Subsequently, a freight cableway was established to ensure that construction materials could be delivered smoothly to the southern bank. Through extensive coordination, a 100-ton crane was transported from the 72 Turns direction to the construction site on the northern bank, where a 60-ton tower crane was also erected. Once the construction materials arrived at the site, they were unloaded using the crane and transferred via the tower crane to a river-crossing hoisting platform. From there, the materials were sent across the river using the cableway, and subsequently, they had to be manually transported to various construction locations, requiring at least four transfer operations in total.
Due to the limitations of regional transportation, the seemingly simple task of pouring concrete became exceptionally challenging in the Nujiang area. The nearest concrete mixing station is located in Baxoi County, over 40 kilometers away, with a travel time of about one hour. However, due to the terrain and road conditions, the mixer trucks could not reach the southern bank of the Nujiang River, and their heavy loads also prevented them from using the freight cableway to cross the river. To address this issue, a steel cable bridge approximately 150 meters long was constructed over the Nujiang River, along with a dedicated concrete delivery pipeline laid on the bridge to transport the concrete to the opposite bank. However, the length of the pipeline often led to blockages during the concrete delivery process. If a blockage occurred, it had to be cleared within an hour; otherwise, the concrete would solidify, necessitating the installation of a new delivery pipeline. Moreover, the significant distance from the mixing station resulted in long transportation times for the mixer trucks, making the cross-river delivery quite complex. Therefore, each batch of concrete had to be delivered and poured with utmost urgency, requiring careful scheduling of the entire transportation and pouring process. Any delay, even minor, could result in a batch of concrete being wasted. The southern bank had multiple concrete pouring locations, and some points on the tops of cliffs had delivery distances that were too long for direct pouring using the concrete delivery pipes. In such cases, workers had to resort to self-mixing concrete, which significantly lowered the construction efficiency and caused the progress to be extremely slow in order to meet quality requirements.
In Tibet, where transportation is inconvenient and construction is greatly affected by weather conditions, steel structures are an ideal building method due to their minimal on-site construction volume, quick installation, and controllable overall costs. The high-altitude glass viewing platform features a steel truss structure, with the furthest cantilever extending 37 meters and the nearest one extending 27 meters. The truss height near the cantilever support is 2.4 meters, gradually decreasing to 1.5 meters at the cantilever end, which is more than 130 meters above the Nu River. Due to transportation restrictions on the G318, particular attention must be paid to the rational division of structural components when constructing with steel, ensuring that materials are split into transportable sizes while maintaining their mechanical performance. The entire steel truss was fabricated in 46 sections at the factory and then transported to the site for assembly and hoisting, with the main truss of the cantilever portion divided into 26 sections. The modular nature of steel structures facilitated the smooth transportation and installation of the viewing platform's structural materials. The hoisting process requires extremely high precision in terms of pre-cambering the cantilever structure, welding, and controlling point displacement, compounded by the frequent strong winds on-site; this high requirement for labor skills is rare even in the Tibet region. The main exterior materials are made of red weathering steel plates and imported SGP laminated glass. These materials share the characteristics of excellent weather resistance, relatively simple construction processes, and ease of simplifying on-site operations, which is beneficial for project implementation. Other components of the project also utilize steel structures, weathering steel plates, and glass as primary materials, collectively creating a unique splash of red in the Nujiang Grand Canyon.
Many areas in Tibet rely on the tourism industry for development; without people's participation, economic circulation would cease, leaving many places increasingly desolate and barren. In the early stages of the project, to support the tourism facilities in the scenic area, nearly 500 acres of fruit orchards were planned on the northern slope of the scenic area. Six years have passed in the blink of an eye, and this land, once a desert, is now covered in greenery. The fruit orchards have been in production for two years, and the ample sunlight in the region has resulted in exceptionally sweet and delicious grapes, pears, peaches, and apples. The Nujiang 72 Bends Grand Canyon scenic area has currently provided at least 48 jobs for locals, with an annual employment income exceeding 3 million yuan. In the future, we sincerely hope this project can empower regional tourism, attract more visitors, and inject new vitality into the development of this vibrant land. May this once-desolate cliffside bloom with countless hopes and make significant contributions to the tourism industry, economic development, job creation, cultural dissemination, and the export of local agricultural products in Tibet.
Creative Team: Archermit
Lead Architect: Youcai Pan
Design Director: Zhe Yang (Partner)
Technical Director: Ren Zhen Chen (Partner)
Design Team: Yu Zhao, Wenshuang Wang, Xiangxin Ge, Jincheng Guo, Xinyue Liu
Construction Drawing Design: Chengdu Sinayulian Architectural Design Co., Ltd.
Architecture Team: Mei Wang, Kan Wang, Ming Lei, Shankun Liao, Xupeng Ma, Xingqi Hao
Structural Team: Xiaobo Wang, Zhigang Deng, Xu Du, Pengze Qu, Tao Yang
Electrical Team: Zhongkai Mo, Yuliang Fu
Photography: Chill Shine and Arch-Exist Photography
Every child who dreams of Tibet holds a G318 dream. The Sichuan-Tibet Highway, renowned as "China's Scenic Avenue," has always been a sacred route for travelers. About 200 km past the junction of the southern and northern Sichuan-Tibet routes from Chengdu to Lhasa lies the most spectacular part of the journey. In the small town of Baxoi, meaning “village under the warrior’s mountain” in Tibetan, famous sights like the Bangda Grassland, Nujiang Grand Canyon, Ranwu Lake, and...
- Year 2024
- Work finished in 2024
- Status Completed works
- Type Bridges and Walkways / Green routes, scenic routes / Belvederes, panoramic terraces
- Websitehttp://www.archermit.com/show-149-326-1.html
- Websitehttps://www.arch-exist.com/photoView?id=857&tit=Architecture&name=Nujiang%2520River%252072%2520Turns%2520Canyon%2520Scenic%2520Area-Archermit


comment